GB300
GB300 NVL72
16 compute racks plus 16 network and service racks, hosting 1,152 GPUs.
MDC2000 · AI INFERENCE AND TRAINING
The MDC2000 modular GPU data center targets 2.5 MW of IT load for larger AI clusters. Power, direct liquid cooling and supporting air cooling are coordinated around the selected NVIDIA server configuration.
Design targets are checked against the selected hardware and complete load schedule. Energy and water performance depend on the site climate, operating load and cooling configuration.
High-density GPU racks need electrical capacity, liquid interfaces, network space and service access that fit together. Supporting equipment still needs air cooling.
MDC2000 coordinates those systems in a prefabricated modular building, designed around the selected NVIDIA reference design and the site.
Low-voltage receiving interface, modular UPS, batteries and independent A/B/C/D rack distribution. Upstream MV switchgear, power transformers and standby generators are outside the base scope unless specifically included.
32 racks in the GB300 layout: 16 compute racks and 16 network and service racks, with access to power, liquid connections and cabling.
Cooling-loop pumping, filtration, controls, leak monitoring and air-side cooling, with fire-protection and monitoring interfaces defined for the project.
External heat rejection selected for the site climate and availability requirements. Dry operation can be supported by stored-water adiabatic assistance where needed.
Module geometry, transport splits and site connections are agreed during project engineering.
The current GB300 NVL72 configuration provides 32 racks and hosts 1,152 GPUs in its 16 compute racks. Network and service equipment are selected around the cluster fabric.
| Rack allocation | Quantity | Design role |
|---|---|---|
| GB300 NVL72 compute racks | 16 | 1,152 GPUs in the GB300 NVL72 configuration |
| Network and service racks | 16 | Networking, storage and service equipment for the selected cluster |
| Total racks | 32 | Compute and support space in one coordinated facility |
The current target is 2.5 MW IT load, with 142 kW per compute rack. The rack maximum is a design limit, not an instruction to multiply every rack by 142 kW. The final equipment schedule sets the total.
GB300
16 compute racks plus 16 network and service racks, hosting 1,152 GPUs.
B300 / B200
Discuss the selected B300 or B200 server arrangement. Rack power, cooling, networking and service geometry are checked for that equipment.
Platform positioning covers GB300, B300 and B200 configurations. The 1,152-GPU count belongs to the GB300 NVL72 layout; other server arrangements need their own rack and load plan.
The current product direction uses an approximately 85% direct liquid / 15% air cooling split. Coolant carries heat from the main compute equipment; an air-side system serves the remaining components and supporting infrastructure.
The coolant, CDU interfaces, flow rates and operating temperatures follow the selected OEM equipment and project design.
The split describes the design direction. The final thermal schedule establishes the actual liquid and air duties.
Dry heat rejection is the starting strategy. Stored, treated water can support adiabatic assistance when the climate requires it.
MDC2000 targets PUE 1.10–1.15. The PUE range means facility energy is 10–15% above IT energy, making the infrastructure overhead clear. It depends on climate and load; it is a design target, not a measured result for every installation.
Annual modelling establishes the energy and water use for the site. Storage volume and refill arrangements are designed separately from annual consumption.
The electrical design coordinates rack supply paths, UPS protection and supporting loads with the selected NVIDIA reference design.
Upstream sources, maintenance, fault domains and control sequences are reviewed as one availability design.
Uptime Institute requirements and OCP recommendations are assessed where relevant to the project. A reference-design statement does not claim a completed facility certification.
Define the server configuration, network, storage, IT load, site climate and deployment plan.
Freeze electrical, thermal, civil, controls, fire and OEM boundaries.
Review fibre routes, rack access, power paths, liquid interfaces, transport and outdoor heat rejection.
Assemble power, thermal, controls and monitoring systems in a controlled environment.
Test the agreed electrical, thermal, control and alarm functions before shipment.
Complete site works in parallel, then position and integrate the system.
Verify the transported and site-connected facility before operational handover.
The delivery programme separates factory work, transport, site installation and commissioning, with the dependencies for each stage agreed in the proposal.
The final load and cooling schedule reconciles rack limits, total IT load, OEM interfaces and site climate. Numerical PUE values are design targets, with annual performance modelled for the project.
FOR SITE OWNERS AND ENERGY COMPANIES
MDC2000 can form the infrastructure for a colocation business. Alongside the facility, we can discuss introductions to prospective tenants and the requirements they bring. Tenant placement and commercial terms are agreed by project.
Tenant introductions do not guarantee occupancy or investment returns. MDC4000 is a coming-soon option for future capacity planning.
The current MDC2000 GB300 NVL72 layout has 16 compute racks and 16 network and service racks, hosting 1,152 GPUs. It targets 2.5 MW of IT load, with a 142 kW design basis per compute rack. The final equipment and load schedules establish the configuration-specific limits.
MDC2000 uses direct liquid cooling for the main GPU heat load and air cooling for residual heat and supporting equipment. Rack CDUs interface with the facility cooling loop, which carries heat to external dry coolers with adiabatic assistance where needed. OEM server interfaces and the site climate determine the final thermal design.
The 2.5 MW figure is MDC2000's target IT load, not the required grid connection. Incoming power must also cover cooling, electrical losses and other facility loads, including the relevant peak and operating conditions. A site load study sizes that supply; an annual PUE target alone cannot do so.
The MDC2000 reference uses dry heat rejection first, with tank-fed adiabatic assistance in hot conditions. That strategy can operate without a permanent utility-water connection, but it still needs treated-water storage and a refill plan where adiabatic operation is required. Annual use and tank sizing follow the site climate and operating profile.
The current published MDC2000 design target is PUE 1.10–1.15. It is not a measured operating result for every installation. A project energy model must state the climate, IT-load profile, cooling modes and energy boundaries before the target can be used in operating-cost assumptions.
MDC2000 is a prefabricated modular building assembled from transportable technical sections. Its layout includes compute and support racks, service circulation and technical systems. Final dimensions, foundation loads, access openings and external cooling clearances come from the configuration-specific project drawings.
The scope defines IT space, facility power distribution, cooling, controls and the associated interfaces. Servers and GPUs are separately identified. Upstream medium-voltage switchgear, power transformers and standby generators are outside the issued base scope unless specifically included. The proposal also assigns site works, installation and commissioning responsibilities.
MDC2000 can provide infrastructure for a site owner hosting a tenant's computing equipment. Facility ownership, GPU ownership, operations and maintenance need separate responsibilities and commercial terms. ModulEdge can discuss prospective tenant introductions alongside the infrastructure project; an introduction does not establish a tenant commitment or investment return.
Request the approved OEM equipment list, rack power and cooling interfaces, project topology and acceptance-test scope. Any claimed certificate should identify its issuer and the design, product or facility it covers. Reference-design alignment, factory testing and a completed site certification are different forms of evidence.
Share the hardware plan, available power or location. We will discuss the infrastructure and, for colocation projects, the potential tenant requirements.