MDC60 · COMPACT AI INFRASTRUCTURE

Put your AI deployment in two racks.

MDC60 brings power, air cooling and IT space together for a compact B200-class server deployment at 60 kW IT load.

60 kW
IT load
2 racks
Equipment space
B200‑class
Target server category
Air cooling
Selected for the configuration

Keep the infrastructure close to the workload.

A small enterprise AI deployment can need dedicated capacity without a large data hall. MDC60 packages the facility systems around two racks and the equipment they contain.

The server model determines rack allocation, airflow, power distribution and service access. We check those interfaces before the configuration is fixed.

Start with the server configuration.

MDC60 targets air-cooled NVIDIA B200-class equipment. Bring the OEM server model, number of systems, and network and storage requirements.

The 60 kW rating is total IT load, including computing and supporting IT equipment. The site connection also serves cooling and other facility loads.

Plan the facility and its connections together.

SystemWhat we define
IT spaceRack dimensions, equipment population, cabling and service access
PowerRack distribution, protected load and supply interfaces
CoolingServer airflow, heat load and operation in the site climate
SiteFoundations, delivery and lifting access, power and fibre connections
ControlsMonitoring, alarms and integration with operating systems

The proposal sets equipment procurement, UPS and battery scope, resilience, external plant and installation responsibilities.

Design. Assemble. Commission.

  1. 01

    Confirm the equipment and location.

    Review the server list, IT load, climate, available power and fibre routes.

  2. 02

    Assemble and complete FAT.

    Integrate the facility systems and carry out factory acceptance testing.

  3. 03

    Install and commission.

    Connect at the prepared site and verify the installed facility before handover.

The delivery programme identifies the dates and dependencies for each stage.

Questions about MDC60

Can it host any B200 server?

The exact OEM configuration needs review. B200 servers can have different dimensions, power and cooling requirements. We check the equipment list against the 60 kW IT load, two-rack arrangement and air-cooling design.

Does 60 kW mean the site needs only a 60 kW connection?

No. The site supply also serves cooling, power-system losses and supporting facility equipment. We size it from the project load study.

Are the servers included?

The core offer is the infrastructure. We can plan around customer-supplied hardware or discuss an equipment package. The proposal states who supplies the servers, GPUs, networking and storage.

Do I need a complete rack plan before contacting you?

No. Start with the equipment or workload, location and target date. We can help define the rack population and remaining site inputs.

What happens when I need more capacity?

We review growth alongside the first deployment. Additional modules or a move to MDC500 or MDC2000 depend on the equipment, cooling and site capacity required.

Tell us what you want to run.

Send the server configuration or describe the AI workload. We will assess how MDC60 fits and what the site needs.

Contact form

Form privacy notice: ModulEdge s.r.o. will use these details to route, assess and respond to your request. Required fields are needed to handle the inquiry. See the Privacy Policy for purposes, retention, recipients and your rights.

Preview build: this form is not connected yet, so nothing was sent.