Blog

Mobile vs Portable Modular Data Centers: Rooftop, Parking-Lot, and Temporary Capacity Playbook

Choose the right outside-first siting model — mobile data center or portable modular — with a complete playbook: use-case matching, siting checklist, and three site readiness templates.

Read the article

Container Data Center: What a "Data Center in a Container" Really Means (and What to Specify)

Practical spec guide for containerized data centers: mechanical/electrical interfaces, transport limits, commissioning tests, monitoring integration (SNMP/Redfish/Modbus), and security baseline controls.

Read the article

Modular vs Prefabricated vs Containerized Data Centers: Procurement Guide

Three terms that flood procurement documents. Three concepts most project teams use interchangeably. One result: mismatched bids, scope disputes, and deployments that miss the brief. This guide is for MEP architects, infrastructure agency leads, and systems integrators writing technical specifications.

Read the article

GPU vs LPU vs NPU: The Inference Era Just Made Your GPU Strategy Obsolete

The AI hardware game is splitting in two: training rewards brute force, inference rewards cost-per-query efficiency, and the dominance of general-purpose GPUs is ending.

Read the article

Modular Data Center Manufacturer vs Provider vs Integrator: How to Select the Right Delivery Model

A procurement framework for system integrators and infrastructure agencies to select between manufacturer, provider, and integrator delivery models for modular data centers. Covers qualification checklists, contract clauses, and acceptance logic to prevent delivery-model mismatch.

Read the article

Modular Data Center Design: Power Architecture and Redundancy

Engineering guide: N vs N+1 vs 2N topologies, single-line diagrams, and acceptance criteria for critical infrastructure

Read the article

Modular Data Center Cost: What Actually Moves CAPEX, OPEX, and Your Timeline

A framework for understanding modular data center pricing – and the five inputs you need before any quote makes sense.

Read the article

On-Site Power: Why Data Centers Are Done Waiting for the Grid

The grid can't keep up with data center growth. On-site power generation with natural gas, solar, and batteries has shifted from temporary workaround to permanent infrastructure strategy — especially for edge deployments where modular data centers deploy in months instead of years.

Read the article

Why One of Central Asia's Largest Banks Chooses Modular Infrastructure Over Colocation and Hyperscalers

When you need 1.9 MW of liquid-cooled AI infrastructure within national borders, colocation trades away control and hyperscale doesn't exist in your region—modular data centers turn a 2-year construction project into a 3-6 month deployment.

Read the article

NVIDIA Blackwell Is Probably Overkill for Your AI Needs

For enterprise AI inference, NVIDIA Blackwell is spectacular overkill—previous-generation GPUs with hybrid cooling deliver the same throughput at half the cost and deploy in 3-6 months instead of 18.

Read the article

White-Label Modular Data Centers for System Integrators: Packaging, Margin, and Delivery Workflow

System integrators can deliver turnkey modular data centers under their own brand in 3–6 months, with margins reaching 48% when combining hardware sales and service revenue.

Read the article

Modular Data Center: Definitive Guide (Types, What’s Included, When It Wins)

A practical guide to modular data centers: types, architectures, what's included, and when prefabricated MDCs outperform traditional builds.

Read the article

Data Centers in Space: The Physics Makes Sense, But Does the Business Model?

Strategic first-principles analysis of space-based data centers and orbital computing: solar power, radiative cooling, inter-satellite laser links, launch cost thresholds, bandwidth limits, and the AI inference business model through 2030–2032.

Read the article

State of the Modular Data Center Market 2026: Annual Report

Grid waits of 7–13 years. Transformer lead times of 4 years. Rack densities tripling. Here's what the data says about modular data centers in 2026 — and what to do about it.

Read the article

Modular Data Center Cooling: Free Cooling vs DX vs Hybrid (Selection by Constraints)

Decision guide for selecting modular data center cooling by climate band, dust and humidity constraints, maintenance model, and PUE targets — with an RFP specification section.

Read the article

Edge AI Infrastructure for Inference: Translating AI Servers into Rack Power, Cooling, and Module Design

How to size power, cooling, and physical infrastructure for edge AI workloads – and why 40 kW per rack marks the inflection point.

Read the article